
ITP and work package plan drafting
Inspection and test plans and work package plans, written from scratch for your project, with hold and witness points, acceptance criteria and the records you need.
ITPs are written by an engineer who has written and approved ITPs on major UK infrastructure. Each one follows your specification, the project requirements and the relevant MCHW series, and a chartered engineer checks it before issue.

What we write
- Inspection and test plans (ITPs) for each activity, with hold and witness points, acceptance criteria, the records required and who is responsible
- Work package plans (WPPs) setting out the sequence, resources, interfaces and responsibilities for each package
- Drafted to your specification, the project requirements and the relevant MCHW series, such as Series 500 drainage, Series 600 earthworks and Series 1700 concrete, plus culverts and structures
- Issued in Word, Excel or your own template
WPP safety content is reviewed against your RAMS and CDM duties; your site team stays responsible for safe systems of work.
Fees
- Inspection and test plan (ITP)
- From £295 each
- Packs of ITPs and work package plans (WPPs)
- Quoted within 1 working day
- Monthly ITP and WPP service
- Monthly rates on requestA set number of ITPs and WPPs each month · 3-month minimum
From specification to issued ITPs
Send the documents
Day 0Your specification, drawings and programme.
Quote
Within 1 working dayThe fee, within 1 working day.
First draft
Per the quoteIn 5 working days.
Check and sign-off
Before issueChecked and signed off, then your comments addressed.
Issued
In your formatIn Word, Excel or your template.
What we draft to
- Your specification
- The contract specification and project requirements come first.
- MCHW Series 500, 600 and 1700
- Drainage, earthworks and concrete, plus culverts and structures where they apply.
- CDM 2015
- WPPs aligned to your RAMS and to contractor duties under CDM 2015.
ITP and WPP questions
Can you use our template?
Yes. If you don't have one, we'll use Word or Excel.
Do you do RAMS?
No. RAMS stay with the contractor. We align the ITPs and WPPs to your RAMS so they agree.
Are the ITPs written for our project?
Yes, from scratch, to your specification and drawings. We don't recycle another job's ITPs.
How does the monthly ITP and WPP service work?
A fixed monthly fee covers a set number of ITPs and WPPs, with a 3-month minimum. Unused documents do not roll over. Ask and we'll quote it.
New package starting?
Send the specification and the activity list. We confirm the number of ITPs and WPPs, the fee and the first-draft date.