Request a quote
Artist's impression of a new two-storey school with a sports court and car park

Artist's impression

MEP design (building services)

Heating, ventilation, electrical, public health and fire alarm design, with energy and overheating assessments.

Price
Fixed quoteWithin 3 working days of a short scope call, so the fee reflects the building and the plant.
Turnaround
Agreed after a scope callUsually planned around a CIF programme or a school-holiday installation window.
Signed by
CEng MCIBSEA CEng MCIBSE building services engineer checks and signs the design.

Mechanical, electrical and public health design for schools, small commercial buildings and refurbishments, from heat loss and heat pumps to fire alarm and BMS layouts.

ILLUSTRATIVE SCHEMATICPlant roomClassroom 1Classroom 2AHUFresh airExhaustHeat pumpFlowReturnHeating flowHeating returnSupply and extract air

What we design

  • Heating, ventilation and air conditioning (HVAC) design, including heat loss (BS EN 12831) and heat pump systems
  • Public health and plumbing, including hot and cold water, above-ground drainage and rainwater
  • Electrical design for small power, lighting and LV distribution, to BS 7671
  • Fire detection and alarm design (BS 5839) and emergency lighting layouts (BS 5266)
  • Extra-low-voltage and building management systems (BMS) design
  • Energy audits, energy modelling and low-carbon retrofit options, for example for school decarbonisation projects
  • Overheating assessments to CIBSE TM59 and Approved Document O
Please note

Statutory SAP and SBEM calculations and EPCs are carried out by an accredited energy assessor. We provide the design information they need.

For contractors

MEP BIM modelling and clash detection

Revit models of the building services, coordinated with the structural and other design models, with clashes found and resolved before they reach site.

  • Revit MEP models from the design or the drawings
  • Coordination with the structural and other design models
  • Clash detection, with issued clash reports and resolution tracked to close
Fee
Fixed quote within 3 working days
Checked by
CEng MCIBSE

How a design job runs

  1. Brief and drawings

    Day 0

    Send the drawings, the brief and your programme.

  2. Quote

    Within 3 working days

    Within 3 working days of a short scope call.

  3. Design and model

    Per the quote

    The systems designed, and modelled where the job needs it.

  4. Check and sign-off

    Before issue

    Checked and signed before issue.

  5. Issue

    Per the quote

    Drawings, specifications and the model, issued in your format.

Design standards

BS EN 12831
Heat loss calculation for heating design and heat pump sizing.
BS 7671
Requirements for electrical installations (the IET Wiring Regulations).
BS 5839-1 and BS 5266-1
Fire detection and alarm systems, and emergency lighting.
CIBSE TM59 and Approved Document O
Overheating assessment and the overheating requirement for new homes.
BB101
Ventilation, thermal comfort and indoor air quality in schools.
Building Regulations
Approved Documents for the works, with building control in mind.

MEP questions

Who signs the work?

A chartered building services engineer, on each design.

Do you do SAP, SBEM or EPCs?

Statutory SAP and SBEM calculations and EPCs are carried out by an accredited energy assessor. We provide the design information they need.

Can you model in our Revit project?

Yes. We'll quote for the modelling and clash detection within 3 working days.

Can you design outside CIF projects?

Yes. Condition upgrades outside CIF, refurbishments and small commercial buildings too.

Do you install the plant?

No. Your contractor installs it, appointed through a tender we can run for you.

Sample pages

Pages from a sample school project pack. Ask and we'll send it in full.

  • Cover from the school project pack sample (watermarked)
    Cover
    Inspection and test plan, drain renewal from the school project pack sample (watermarked)
    Inspection and test plan, drain renewal
    Bill of quantities extract from the school project pack sample (watermarked)
    Bill of quantities extract

    School project pack

    One school project from the CIF bid through tender, bill of quantities, the inspection and test plan for the drain renewal and NEC administration to handover.

    Request the full sample

The samples use made-up projects, so the names and figures aren't real.

Send the drawings and the plant schedule.

Tell us the building, the systems and your programme. After a short scope call we'll quote within 3 working days.